top of page

Construction

The following images are the speed controller, and motor being soldered together. 

The following picture is a diagram of the wiring process. 

Wiring%20Diagram_edited.jpg

The following video is the construction of the chassis plate, specifically the drilling of the holes for the differential mounting position. 

The following picture shows the welding of the bolts needed to mount the control arms to the chassis plate.

PXL_20210219_213316465.jpg
bottom of page